Automated Schedule Updates Using As-Built Data and a 4D Building Information Model

Citations

WEB OF SCIENCE

64
Citations

SCOPUS

78

초록

A schedule update is defined as a process for measuring the status of a project, predicting the date of its completion, and providing project managers with critical schedule information. The updated schedule information helps project managers evaluate their projects and take appropriate actions that will enable them to finish projects on time. In current practice, most schedule-update processes are performed manually, require considerable time and effort, and rely on subjective experience. This study proposes data flow and develops a system that updates schedules automatically through the use of project-management software and provides critical schedule information to project managers. The proposed system is based on the use of three-dimensional (3D) point-cloud data from construction sites and a four-dimensional (4D) model that includes an as-planned schedule. To verify the performance of the system developed in this study, a case study based on an actual construction site was conducted. The results show that the proposed system contributes to the automation of all steps involved in schedule updating. With automatic schedule updates, the practice can be made more efficient, and the process of schedule updating can be performed in a reliable and objective manner.

키워드

As-built data; Automated schedule update; Project-management software; Progress measurement; Four-dimensional (4D) building information model; CONSTRUCTION PROJECTS; PROGRESS MEASUREMENT; PERFORMANCE CONTROL; 3D DATA; REGISTRATION; CAD; MANAGEMENT; DELAY; COST
제목
Automated Schedule Updates Using As-Built Data and a 4D Building Information Model
저자
Son, Hyojoo; Kim, Changwan; Cho, Yong Kwon
DOI
10.1061/(ASCE)ME.1943-5479.0000528
발행일
2017-07
유형
Article
저널명
Journal of Management in Engineering - ASCE
권
33
호
4