상세 보기
초록
The CCC-r chart is more effective than traditional attribute control charts for monitoring high-quality processes. In-control process parameters are typically unknown and should be estimated when implementing a CCC-r chart. Phase II control chart performance can deteriorate due to the effect of the estimation error. In this paper, we used the standard deviation of average run length (ARL) as well as the average of ARL to quantify the between-practitioner variability in the CCC-r chart performance. The results indicate that the CCC-r chart requires larger Phase I data than previously recommended in the literature in order to have consistent chart in-control performance among practitioners.
키워드
ARL; average of ARL; CCC-r chart; Phase I; standard deviation of ARL; GEOMETRIC CHARTS; (X)OVER-BAR; LIMITS
- 제목
- 추정된 모수를 사용한 CCC-r 관리도에서 관리상태의 성능
- 저자
- 김재연; 김민지; 이재헌
- 발행일
- 2018-08
- 저널명
- 응용통계연구
- 권
- 31
- 호
- 4
- 페이지
- 485 ~ 495
- 언어
- KOR
- 출판사
- 한국통계학회
- 발행국가
- 대한민국
- 분량
- 11 페이지
- ISSN
- E 2383-5818
P 1225-066X