상세 보기
인 처리시설 시운전 및 정상운전 자료 비교·분석 연구
- 윤소영;
- 유재나;
- 김종욱;
- 오재일
초록
This study aimed to obtain quantitative data for WWTP operators in phosphorus removal process. This was done by reviewing and comparing phosphorus removal efficiency(%), coagulants dosage(Al/P and Al2O3(mg/L)), sludge production(kg/㎥), and operation cost(won/㎥) of start-up and normal operation data. Phosphorus removal efficiency of all tertiary treatment process was up to 70 ~ 89 % in start-up and normal operation. Average molar ratio(Al/P) was similar as 5 in both operations, but average coagulants dosage (mg/L) of start-up (8.5 mg/L) was higher than normal operation (6.2 mg/L). Average operation cost was higher for start-up (33.6 won/㎥) than normal operation (28.4 won/㎥), while electricity cost was required for the normal operation (9.0 won/㎥) was higher by 3.5 won/㎥.
키워드
- 제목
- 인 처리시설 시운전 및 정상운전 자료 비교·분석 연구
- 제목 (타언어)
- A Comparative Study on Start-up and Normal Operation Data for Phosphorus Removal in WWTPs
- 저자
- 윤소영; 유재나; 김종욱; 오재일
- 발행일
- 2013-02
- 저널명
- 상하수도학회지
- 권
- 27
- 호
- 1
- 페이지
- 113 ~ 120
- 출판사
- 대한상하수도학회
- 발행국가
- 대한민국
- 분량
- 8 페이지
- ISSN
- E 2287-822X
P 1225-7672