Development of 3D information models for the maintenance of subway infrastructures

Citations

SCOPUS

0

초록

Maintenance of subway tunnels and stations is one of the most difficult areas because of limited allowed inspection time and complex environment surrounding the infrastructures. Congested urban buildings and underground facilities make the construction and renovation of subway infrastructures more troublesome. In this paper, 3D information models including geometry models and their related information were developed for the maintenance of subway systems. Information architectures considered current inspection items and required documentations. 3D models have previous inspection data and damage drawings for inspector's convenience because inspectors have less than 4 hours at night. Mobile devices can utilize the developed models for inspectors due to wireless networks in underground tunnels. Inspected results are transmitted to the facility management system for the assessment of current status of subway structures. Newly proposed system significantly increases efficiency of the inspection and well organized data for the assessment of underground tunnels and stations. Owners of subway systems can utilize the data for the developing new requirements of new subway designs in order to reduce maintenance cost.

키워드

3D information model; Assessment; Inspection; Maintenance; Subway; 3D information; 3D models; Assessment; Complex environments; Current status; Developed model; Facility management systems; Geometry model; Information architectures; Inspection time; Maintenance cost; Subway systems; Subway tunnels; Underground tunnels; Urban buildings; Information theory; Inspection; Knowledge management; Maintenance; Management; Mobile devices; Office buildings; Railroads; Robotics; Subways; Tunnels; Underpasses; Three dimensional
제목
Development of 3D information models for the maintenance of subway infrastructures
저자
Shim, C.S.; Kim, S.W.
DOI
10.22260/isarc2011/0116
발행일
2011
유형
Conference Paper
저널명
Proceedings of the 28th International Symposium on Automation and Robotics in Construction, ISARC 2011
페이지
623 ~ 624