Supplementary Control of Conventional Coordinated Control for 1000 MW Ultra-Supercritical Thermal Power Plant Using One-Step Ahead Control

Citations

WEB OF SCIENCE

4
Citations

SCOPUS

5

초록

The intermittence of renewable energy sources increases the importance of the effective load-tracking ability of power plants. Coordinated control between boiler and turbine systems is the uppermost layer of a thermal power plant control to follow the load demand. In this paper, a supplementary controller is proposed based on the One-Step Ahead strategy for coordinated control of thermal power plants. After a plant model is developed offline from a step response test, the optimized control of the One-Step Ahead strategy is applied to the boiler feed-forward (BFF) signal to control the electric power output and the main steam pressure simultaneously. Simulation with a 1000 MW ultra-supercritical (USC) once-through type power plant is performed. The results show that the error of Mega-Watt Output (MWO) was reduced to 78~95%, and settling time was reduced to 64~79% from conventional coordinated control by adding the proposed supplementary controller. © 2023 by the authors.

키워드

boiler–turbine systemcoordinated controlone-step ahead controlpower plant controlultra-supercritical (USC) power plant
제목
Supplementary Control of Conventional Coordinated Control for 1000 MW Ultra-Supercritical Thermal Power Plant Using One-Step Ahead Control
저자
Choi, HyukChoi, YeongseokMoon, Un-ChulLee, Kwang Y.
DOI
10.3390/en16176197
발행일
2023-09
유형
Article
저널명
Energies
16
17

파일 다운로드