Flexibility-Based Reserve Scheduling of Pumped Hydroelectric Energy Storage in Korea

Citations

WEB OF SCIENCE

13
Citations

SCOPUS

14

초록

The high penetration of renewable energy resources has made it harder to secure a flexible power system. Accordingly, this has become an issue in operating power systems. As a possible solution, pumped hydroelectric energy storage (PHES) has received much attention because of its fast start-up and ramp characteristics. This study proposes a flexibility-based reserve scheduling method for PHES. In this method, the reserve scheduling of PHES was conducted to improve flexibility; the associated risk index was termed the ramping capability shortage expectation (RSE). The peak-load days in 2016 and 2029 were selected to examine the applicability and performance of the proposed method. Results indicate that the proposed method can improve the flexibility by 4.45% for 2016 and 0.9% for 2029, respectively.

키워드

flexibility; pumped hydroelectric storage; ramping capability shortage expectation; renewable energy resources; reserve scheduling; POWER-PLANTS; SYSTEM; WIND; OPERATION
제목
Flexibility-Based Reserve Scheduling of Pumped Hydroelectric Energy Storage in Korea
저자
Min, Chang-Gi; Kim, Mun Kyeom
DOI
10.3390/en10101478
발행일
2017-10
유형
Article
저널명
Energies
권
10
호
10

파일 다운로드

Thumbnail