상세 보기
수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선)적용을 통한 수질관리 대안 모색 - 금호강 유역 대상
- 윤소영;
- 유재나;
- 오재일
초록
This study was to develop effective water quality management measures using LDC (Load Duration Curve) curves for TMDL (Total Maximum Daily Loads) unit watershed. Using LDC curves, major factors for BOD and T-P concentration loads generation (i.e. point source or non-point source) in the case study area (Geumho river basin) were found for different hydrologic conditions. Different measures to deal with the pollutant loads were suggested to establish BMPs (Best Management Practices). It was found that the target area has urgent T-P management methods especially at moist and midrange hydrologic conditions because of point source pollutants occurred in developed areas. One example measure for this could be establishment of advanced treatment facility. This study proved that the use of LDC was a useful way to achieve TWQ (Target Water Quality) on the target watershed considered. It was also expected that the methodology applied in this study could have a wider application on the establishment of watershed water management measures.
키워드
- 제목
- 수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선)적용을 통한 수질관리 대안 모색 - 금호강 유역 대상
- 제목 (타언어)
- Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve
- 저자
- 윤소영; 유재나; 오재일
- 발행일
- 2013-08
- 저널명
- 상하수도학회지
- 권
- 27
- 호
- 4
- 페이지
- 429 ~ 438
- 언어
- KOR
- 출판사
- 대한상하수도학회
- 발행국가
- 대한민국
- 분량
- 10 페이지
- ISSN
- E 2287-822X
P 1225-7672